Description
Installation Specifications
The first step is site investigation and foundation preparation.This includes measuring the ground’s levelness, load-bearing capacity and drainage conditions.
The second step is excavation of the foundation pit and treatment of the base layer.The appropriate depth of the pit needs to be excavated according to the size of the 2026 quality & cheap acrylic swimming pool, and a reinforcement layer and a waterproof layer should be laid.
The third step is the lifting and positioning of the swimming pool body.Place the prefabricated transparent custom acrylic swimming pool body in the foundation pit and adjust it to a horizontal position.
The fourth step involves the connection between pipelines and equipment.Including the installation and testing of the inlet, outlet and filtration device.Fill the gaps around the pool body with appropriate materials and reinforce the overall structure.
The final step is backfilling and fixing.Check for any leaks or structural issues.
After higher thermal conductivity acrylic swimming pool installation, multiple water injection tests are required
Daily Maintenance Precautions
The maintenance is relatively simple, but it needs to be carried out regularly to ensure its service life.
The maintenance of water quality is crucial.It is necessary to regularly test indicators such as pH value and residual chlorine content, and use special cleaners to prevent the growth of algae.
Soft tools and non corrosive cleaning solutions should be used for cleaning the pool walls and bottom.Avoid scratching the surface.
The filtration system needs to be cleaned or replaced with filter cartridges according to the instructions.
When not in use, it is recommended to cover the 2026 quality & cheap acrylic swimming pool with a lid.Prevent debris from falling in





Reviews
There are no reviews yet.