Description
Installation Specifications
The first step is site investigation and foundation preparation.This includes measuring the ground’s levelness, load-bearing capacity and drainage conditions.
The second step is excavation of the foundation pit and treatment of the base layer.The appropriate depth of the pit needs to be excavated according to the size of the Custom Transparent Swimming Pool , and a reinforcement layer and a waterproof layer should be laid.
The third step is the lifting and positioning of the swimming pool body.Place the prefabricated transparent custom acrylic swimming pool body in the foundation pit and adjust it to a horizontal position.
The fourth step involves the connection between pipelines and equipment.Including the installation and testing of the inlet, outlet and filtration device.Fill the gaps around the pool body with appropriate materials and reinforce the overall structure.
The final step is back filling and fixing.Check for any leaks or structural issues.
After Higher Thermal Conductivity Acrylic Swimming Pool installation, multiple water injection tests are required





Reviews
There are no reviews yet.